Friday, June 19, 2015

Affected Areas For Scheduled Power Interruption By BENECO From June 22 To June 27

In the latest Notice of Power Interruption released by the Benguet Electric Cooperative, Inc. (BENECO), parts of Baguio City, La Trinidad, and Itogon are going to have scheduled brownouts on June 22, 23, 26 and 27.

The schedule of power interruption is as follows:

June 22 (Monday) - Parts of Bodiweng, Bineng, La Trinidad (replacement of rotten secondary poles)

June 23 (Tuesday) - Parts of Purok 4, Balsigan, Baguio City (relocation of secondary pole)
-Parts of Purok 2, Gibraltar, Baguio City (relocation of secondary pole)

June 26 (Friday) - Parts of Poblacion, Ampucao, Ucab, Gumatdang, Virac and Atok Trail in Itogon, Benguet (rerouting of primary lines along Benguet Corporation tailings dam)
- Parts of Kias and Fort Del Pilar in Baguio City (rerouting of primary lines along Benguet Corporation tailings dam)

June 27 (Saturday) - Parts of Bagueng, Tinongdan, Itogon (extension of 240V lines to correct long service drop connections)